From groundbreaking infrastructure developments to cutting-edge technological solutions, each project showcases our commitment to delivering superior engineering services tailored to meet the unique needs of our clients. Explore our achievements and witness the transformative power of engineering ingenuity at its finest
S/NO | DESCRIPTION | CLIENT | YEAR |
---|---|---|---|
1 | Installation of EMCP 11 panel | Schlumberger | 2010 |
2 | To trouble shoot cause of engine failure to start | Schlumberger | 2010 |
3 | To install six unit injectors and calibrate | Japual Oil & Marine Services Plc | 2010 |
4 | Servicing maintenance | BMS Hospital | 2010 |
5 | To trouble shoot and rectify cause of engine failure to start | Japual Oil & Marine Services Plc | 2011 |
6 | To trouble shoot cause of engine failure, having hard starting and install six unit injector and calibrate | Fenog Nigeria Ltd | 2011 |
7 | To trouble shoot and rectify cause of engine failure to start | Delta Environmental Logistic Ltd | 2011 |
8 | Installation of turbo charger | Delta Environmental Logistic Ltd | 2011 |
9 | To trouble shoot and rectify cause of engine failure to start | Hollified Industry Ltd | 2012 |
10 | To trouble shoot and rectify cause of engine failure to start and install fuel pump and change oil | Hamik Engineering Ltd | 2012 |
11 | To trouble shoot and rectify cause of engine failure to start | K.D.I Oil And Gas Ltd | 2012 |
12 | Install six unit injector and calibrate | Fenog Nigeria Ltd | 2012 |
13 | To install top gasket and cylinder head To install fuel pump To install turbo charger To install rocker arm and set the valves |
Peacot Nigeria Ltd | 2012 |
14 | To install injector and programming | Pelorreach Ltd | 2012 |
15 | Stripping, Inspection and Complete Overhaul of 3512 (1275kva) Engine | Alex Aluminum | 2013/14 |
16 | Servicing maintenance | Alex Aluminum | 2013/14 |
17 | Stripping, Inspection and Complete Overhaul of D399Engine, Test run and Commission | DWC Drilling Nig. Ltd | 2013/14 |
18 | Rectify cause of Engine shutting down on load | DWC Drilling Nig. Ltd | 2014 |
19 | To introduce new fittings on Swamp Boogie to enable fuel system work properly | Alliance Logistics | 2013 |
20 | To install six unit injectors and calibrate | Alliance Logistics | 2014 |
21 | Servicing maintenance | BMS Hospital | 2013/14 |
22 | To replace faulty Final drive and test run 320C Excavator | KDI Oil and Gas Ltd | 2013 |
23 | To trouble shoot and rectify cause of D6R machine fail to move forward and reverse | KDI Oil and Gas Ltd | 2013 |
24 | To install six unit injectors and rectify the low power on hydraulic system | KDI Oil and Gas Ltd | 2014 |
25 | To trouble shoot and rectify cause of Dredger engine fail to Start | Oxygen Project Ltd | 2014 |
26 | To install new Electronic Panel and Calibrate to CAT specification | Oxygen Project Ltd | 2014 |
27 | To introduce new fittings on Swamp Boogie to enable fuel system work properly | Evomec Global Services Ltd | 2013 |
28 | Rectify cause of Engine Mis-Firing, Monitor panel not displaying and Hydraulic Switch not functioning | Evomec Global Services Ltd | 2014 |
29 | Trouble shoot and rectify cause of D6R Dozer fail to move forward and reverse | Evomec Global Services Ltd | 2014 |
30 | Rectify cause of 140H Grader steering not working | Evomec Global Services Ltd | 2014 |
31 | Rectify faulty Excavator and Programming of New display Monitoring panel | Evomec Global Services Ltd | 2014 |
32 | Replace faulty Turbo Charger cartridge in Engine | Golden Tulip Hotel | 2013 |
33 | To Strip and inspect cause of Water Dilution on engine Oil | Golden Tulip Hotel | 2013 |
34 | Rectify Swamp Boogie having Hard starting with Flit | Petra Services Ltd | 2014 |